Skip to main content
See all articles

Renovation projects that a buyer should not purchase a home without

Buying a home that needs work can be a sensible way into a suburb you could not otherwise afford. The trick is knowing which problems should stop a purchase unless the price or contract deals with them, which ones are fair game for negotiation, and how a lender will view the property and your renovation plans.

Problems that should stop a purchase unless they are dealt with

If a building and pest inspection turns up any of these, proceed only if the seller fixes the problem or the price reflects the real cost of repair.

  • Structural movement. Cracking in brickwork, sloping floors and movement in the footings or slab can point to subsidence or reactive soil. An engineer’s report is usually needed before anyone can price the repair.
  • Termite activity or damage. Termite damage is common across Australia and often hidden behind wall linings. A timber pest inspection is the starting point, but a builder may need to open walls to find the full extent.
  • Roof and water entry. Rusted sheeting, cracked tiles and failed flashings let water in. A new roof is a major cost, and years of water entry usually bring mould and rising damp with them.
  • Unsafe wiring and plumbing. Deteriorated wiring, no safety switches, corroded pipes or collapsed sewer lines can mean a full rewire or replumb. Have a licensed electrician or plumber price the fix first.
  • Unapproved building work. Extensions and decks built without council approval can be flagged by a valuer, and the council may order them rectified or removed. Your solicitor or conveyancer can arrange the searches.

Projects you can usually negotiate or do later

These are about taste and comfort rather than safety, and can be reflected in your offer or left for later.

  • Cosmetic updates. Dated kitchens and bathrooms, worn carpet and tired paint are the classic bargaining points and rarely affect a lender’s view of the property.
  • Comfort and efficiency. An ageing air conditioner, old appliances or poor insulation can be priced into your offer rather than treated as reasons to walk away.
  • Minor repairs. A broken fence or a dripping tap can be covered by a special condition requiring the seller to fix them before settlement, confirmed at the pre-settlement inspection.

The reports every Australian buyer should order

Building and pest inspection

A combined building and pest inspection by a licensed inspector covers structural issues, damp, electrical safety and termite activity in the accessible parts of the home. Moneysmart suggests organising it as soon as you have made an offer, so the results land within the cooling-off period or any inspection condition. If the report raises a question, get the relevant trade to quote before you commit.

Strata or body corporate records

For a unit or townhouse, a strata report or body corporate records search matters as much as the building inspection. It shows the levies, the sinking or capital works fund balance, planned special levies, insurance, by-laws, and minutes that may reveal disputes or defects such as failed waterproofing or cladding. A thin sinking fund and deferred maintenance can cost far more than the asking price suggests.

How lenders look at a property that needs work

Lenders assess and approve every loan on their own criteria, and the condition of the property is part of that assessment.

  • The valuation. The lender’s valuer may arrive at a figure below the purchase price if significant work is needed. Some lenders will not accept a property as security if it lacks a working kitchen or bathroom, has structural issues or includes unapproved work. A low valuation means a larger deposit.
  • Serviceability. The lender looks at your income, living expenses and existing debts, and wants to know how the renovation will be paid for. Payslips, bank statements and written quotes for the work all form part of the picture.

Ways to fund the renovation

  • Construction loan. Suited to structural renovations by a licensed builder under a fixed-price contract. The lender usually wants council-approved plans, the signed contract and the builder’s insurance, values the property as if complete, and releases funds in progress payments at agreed stages rather than as a lump sum.
  • Top-up or loan increase. If you have equity in a home you already own, a top-up on your existing loan or a refinance with additional funds can pay for the work. The lender reassesses your full position first.

Oakwood Finance Pty Ltd arranges credit as Credit Representative 561236 of Finsure Finance & Insurance Pty Ltd, Australian Credit Licence 384704. We help you compare home loan options from a panel of lenders and prepare the application; the lender assesses and approves. Our calculators are a useful starting point.

Before you sign

In many states a private treaty contract can be made subject to finance and to a satisfactory building and pest inspection, while auction purchases are unconditional, so do your checks beforehand. Ask your solicitor or conveyancer to review the contract and draft any special conditions covering agreed repairs. If the essential work costs too much and the seller will not move, be prepared to walk away.

If you are weighing up a property that needs work, book a consultation at https://my.oakwoodfinance.com.au/book/. This article is general information only and does not take your objectives, financial situation or needs into account.